Monday, November 19, 2012

Trail work day at Royalview

Good trail day yesterday at Royalview out and back loop. The Metropark crew has built a few more bridges on this section. This section is going to have a few different features that the original loops, like a few rock jumps.



Huge Oak tree in the background that you can't see in the summer.

2 comments:

  1. Those bridges look like a lot of fun to ride. My local trails need some work, they would benefit from a few structures like this!

    ReplyDelete
  2. This is all new here. The Cleveland metro parks have a new administrator and they are working together with our local MTB club CAMBA. 10 miles of flowy fast ST

    ReplyDelete